Mts Series 322 Load Frames Manuale Utente Pagina 43

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 96
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 42
Install the Crosshead Assembly
Series 322 Load Unit Installation
43
1. Tighten the crosshead manual locking bolts.
Manually locked
crosshead
Check the torque on the locking bolts, following the pattern in the following
figure.
Make sure the locks are tight.
Load Unit Rating 100 kN (22 kip)
100 N·m (140 lbf·ft)
Load Unit Rating 250 kN (55 kip)
271 N·m (200 lbf·ft)
Load Unit Rating 500 kN (110 kip)
Rear
271 N·m (200 lbf·ft)
Load Unit Rating 500 kN (110 kip)
Front
271 N·m (200 lbf·ft)
Vedere la pagina 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 95 96

Commenti su questo manuale

Nessun commento